
[SK1265] Bucheon Combined Heat and Power (CHP) Plant Construction Site
2025. 6. 11.



General Contractor/Subcontractor: Bumyang Guitturami Air Conditioning Co., Ltd.
Site Name: Bucheon Combined Heat and Power (CHP) Plant Construction Site
Location: Samjeong-dong, Ojeong-gu, Bucheon-si, Gyeonggi-do
Equipment Deployed: SK1265-AT6 (Hook Height 35m / Jib Length 60m / Tip Load 1.7t)
Deployment Period: Jun. 2025 ~ Present (Ongoing)
Work Details and Special Notes: -
