
[SK1265] Giheung Lotte Hicks U Tower Construction Site
2018. 5. 31.

Site Name: Lotte Hicks U Tower Officetel Construction Site
Location: Giheung-gu, Yongin-si, Gyeonggi-do
Deployed Equipment: SK1265-AT6 (Hook Height 35 m / Jib Length 60 m / Tip Load 1.7 t)
Deployment Period: May 2018
Work Details and Special Notes: Material lifting in parallel with 2 tower cranes
