
[SK1265] Pyeongtaek Good Morning Hospital
2020. 10. 26.

General Contractor/Subcontractor: Good Morning Hospital
Site Name: Good Morning Hospital
Location: Pyeongtaek-si, Gyeonggi-do
Equipment Deployed: SK1265-AT6 (Hook Height 35m / Jib Length 60m / Tip Load 1.7t)
Deployment Period: Oct. 2020
Work Details and Special Notes:
Installation and lifting of upper structures on existing building
Luffing mode operation (Radius 52m / Height 65m)
