[SK1265/SK598] POSCO E&C Paju Unjeong Sewage Treatment Facility Site
2021. 5. 26.

General Contractor/Subcontractor: POSCO E&C
Site Name: Sewage Treatment Facility Construction
Location: Paju-si, Gyeonggi-do
Equipment Deployed:
SK1265-AT6 (2 units, Hook Height 35m / Jib Length 60m / Tip Load 1.7t)
SK598-AT5 (1 unit, Hook Height 30m / Jib Length 48m / Tip Load 1.7t)
Deployment Period: May 2021
Work Details and Special Notes:
Material lifting with 3 mobile towers without fixed tower cranes
Safety training conducted due to proximity to large elecricity transmission towers, accident prevention