[SK1265] Yongin Lotte Wastewater Treatment Facility Construction Site

2025. 9. 13.




  • General Contractor/Subcontractor: Lotte E&C, Machun Construction

  • Site Name: Yongin Wastewater Treatment Facility Construction Site

  • Location: Wonsam-myeon, Cheoin-gu, Yongin-si, Gyeonggi-do

  • Equipment Deployed: SK1265-AT6 (Hook Height 35m / Jib Length 60m / Tip Load 1.7t)

  • Deployment Period: Sep. 2025 ~ Present (Ongoing)

  • Work Details and Special Notes: -

Hanil Mobile Tower Crane

- The ULTIMATE partner, at your SITE -

111-1 Yongso-ri, Yanggam-myeon, Hwaseong-si, Gyeonggi-do, South Korea

Copyright 2025 Hanil Construction Cranes Co. Ltd., All Rights reserved.