
[SK488/SK598] Wirye Forest Elementary School Construction Site
2020. 9. 14.

Site Name: Wirye New Town Elementary School Construction Site
Location: Wirye-dong, Hanam-si, Gyeonggi-do
Deployed Equipment:
SK488-AT4 (Hook Height 25 m / Jib Length 40 m / Tip Load 2.1 t)
SK598-AT5 (Hook Height 30 m / Jib Length 48 m / Tip Load 1.7 t)
Deployment Period: Sep. 2020
Work Details and Special Notes:
Material lifting and concrete pouring using 2 mobile towers without tower crane
