
[SK488/SK599] Dongtan 2nd New Town Logistics Center Block C Site
2019. 7. 18.

Site Name: Dongtan 2nd New Town Logistics Center Block C Site
Location: Jangji-dong, Dongtan 2 New Town, Hwaseong-si, Gyeonggi-do
Deployed Equipment:
SK488-AT4 (Hook Height 25 m / Jib Length 40 m / Tip Load 2.1 t),
SK599-AT5 (Hook Height 33 m / Jib Length 50 m / Tip Load 1.9 t)
Deployment Period: Jul. 2019
Work Details and Special Notes: Material lifting / Simultaneous operation of two units
