[SK598] Suwon Yeongtong District 2 Maintenance Infrastructure

2026. 2. 21.


  • General Contractor/Subcontractor: The HS Construction Co., Ltd. / Kyungdong Construction Co., Ltd.

  • Site Name: Yeongtong District 2 Maintenance Infrastructure (Parking Lot) Construction Site

  • Location: 897 Maetan-dong, Yeongtong-gu, Suwon-si, Gyeonggi-do, Republic of Korea

  • Deployed Equipment: SK598-AT5 (Hook Height: 30m / Jib Length: 48m / Tip Load: 1.7t)

  • Deployment Period: FEB 2026 – Present (Ongoing)

  • Work Details and Special Notes: -

Hanil Mobile Tower Crane

- The ULTIMATE partner, at your SITE -

111-1 Yongso-ri, Yanggam-myeon, Hwaseong-si, Gyeonggi-do, South Korea

Copyright 2025 Hanil Construction Cranes Co. Ltd., All Rights reserved.