[70m Articulating] Sejong-Pocheon Expressway Bridge Construction

2025. 6. 26.


  • Site Name: Sejong-Pocheon Expressway Bridge Construction Site

  • Location: Cheongsong-ri, Jeondong-myeon, Sejong City

  • Equipment Deployed: 70m Articulating Aerial Platform

  • Deployment Period: Jun. 26, 2025

  • Work Details and Special Notes:

    • Installation of steel and concrete members for bridge structures

    • Articulating aerial platform for stable access even in rugged terrain

Hanil Mobile Tower Crane

- The ULTIMATE partner, at your SITE -

111-1 Yongso-ri, Yanggam-myeon, Hwaseong-si, Gyeonggi-do, South Korea

Copyright 2025 Hanil Construction Cranes Co. Ltd., All Rights reserved.